Bradfield Scheme
Proposed 1938 (revised 1941-42). Not constructed. Reassessed by CSIRO for the National Water Grid Authority (reports 2021).
A 1930s plan to pipe wet-tropics water into dry inland Australia. It was never built. Modern hydrology still says the water is less, and the bill is larger, than the dream.
Read the card →